ASTM F24 Explained: A Complete Guide to Amusement Ride Safety Standards
If you're comparing amusement ride suppliers, you've probably seen terms like ASTM, CE, EN 13814, or ISO 9001. These terms are often presented together, but they cover different aspects of safety, legal compliance, and manufacturing quality.
Among them, ASTM F24 is a key reference for amusement ride safety. This guide explains the role of the ASTM amusement ride standard system, how it affects equipment procurement, and what buyers should verify before purchasing a ride.
- What Is ASTM F24?
- ASTM Certification vs. ASTM Compliance
- Why ASTM Matters When Buying Amusement Rides?
- What Does ASTM Cover?
- Which Rides Are Covered?
- 10 Documents Buyers Should Always Request
- ASTM vs. EN 13814 vs. CE vs. ISO 9001
- How to Check ASTM Compliance
- SUNHONG's Support for ASTM-Compliant Amusement Rides
- FAQ
What Is ASTM F24?
ASTM F24 is the ASTM International technical committee responsible for developing safety standards for amusement rides and devices. It does not refer to one certificate or one universal standard. Instead, the standards for ASTM F24 amusement rides cover the full ride lifecycle, from design and manufacturing to testing, operation, maintenance, and inspection.
When a supplier claims that a ride complies with ASTM requirements, buyers should verify:
- The applicable ASTM standard numbers and editions
- The exact ride model, capacity, and configuration covered
- Any exclusions, deviations, or project-specific conditions
- Supporting calculations, drawings, test reports, manuals, and inspection records
The core issue is whether the supplier can connect its ASTM claim to the actual ride being purchased. A general statement such as “ASTM compliant” has limited value without model-specific technical evidence.
ASTM Certification vs. ASTM Compliance
| Question | Answer | What Buyers Should Do |
|---|---|---|
| Is ASTM F24 a certificate? | No. ASTM F24 is the committee that develops amusement ride safety standards. | Don't accept a generic "ASTM certificate." |
| Can a ride be ASTM compliant? | Yes. A ride can be designed and manufactured to meet applicable ASTM F24 standards. | Ask which ASTM standards the ride complies with. |
| Does ASTM certify amusement rides? | No. ASTM publishes standards but does not certify products. | Request compliance documents from the manufacturer. |
| Who verifies compliance? | Verification may be performed by qualified engineers, inspection bodies, or local authorities, depending on the project. | Confirm who is responsible for the review. |
| Is third-party inspection required? | Not always. Requirements depend on local regulations and project specifications. | Check inspection requirements before production begins. |

Why ASTM Matters When Buying Amusement Rides?
Choosing a supplier with experience in ASTM-compliant amusement rides can improve safety, approval efficiency, and long-term operation. The value comes from established engineering, testing, and documentation systems rather than from a general ASTM certificate.
- Safer purchasing: Buyers can review calculations, restraints, controls, materials, welding records, and operating limits before delivery.
- Lower compliance costs: Mature design methods and test procedures reduce repeated engineering work, redesign, and extra review fees.
- Easier project approval: Complete drawings, reports, and manuals give inspectors and local engineers clearer technical evidence.
- Lower operating risk: ASTM-related procedures support staff training, daily checks, preventive maintenance, and emergency response.
- Better insurance support: Technical specifications, inspection records, and maintenance documents are easier to provide during insurance review.
- Higher equipment reliability: Material traceability, factory testing, wear limits, and maintenance schedules help reduce faults and downtime.
- Easier future export: A complete technical file simplifies later relocation, resale, or review in another market.
ASTM compliance does not guarantee approval in every country, but it gives buyers a stronger basis for comparing suppliers and controlling hidden project risks.
What Does ASTM Cover?
|
Stage |
ASTM Focus |
Evidence Buyers Should Request |
|
Design |
Loads, motion, restraints, clearances, controls, evacuation |
Calculations, risk analysis, design drawings |
|
Manufacturing |
Materials, welding, fabrication, component control |
Material certificates, welding and inspection records |
|
Installation |
Foundation, anchoring, leveling, utilities |
Foundation drawings, installation instructions, site records |
|
Testing |
Load, brake, sensor, interlock, and emergency functions |
FAT and commissioning reports |
|
Operation |
Loading, rider restrictions, dispatch, and shutdown |
Operation manual, checklists, training records |
|
Maintenance |
Lubrication, wear limits, adjustment, and replacement |
Maintenance schedule, service procedures, spare-parts list |
|
Inspection |
Daily, periodic, post-repair, and special checks |
Inspection forms and service history |
This lifecycle approach means ASTM amusement ride inspection should be supported by design, testing, operation, and maintenance records.
Larva Reindeer Sleigh - Christmas Theme Amusement Ride
Which Rides Are Covered?
|
Ride Type |
Typical Coverage |
Main Procurement Focus |
|
Roller coaster |
Yes |
Track loads, braking, restraints, evacuation |
|
Ferris wheel |
Yes |
Wind loads, structure, drive, emergency lowering |
|
Pirate ship |
Yes |
Dynamic loads, swing limits, restraints |
|
Flying chair |
Yes |
Suspension parts, speed, clearance, fatigue |
|
Tagada ride |
Yes |
Passenger containment and operating procedures |
|
Drop tower |
Yes |
Brakes, control redundancy, restraints |
|
Bumper cars |
Yes |
Power system, barriers, vehicle controls |
|
Trackless train |
Depends on use |
Speed, route, braking, passenger capacity |
|
Kiddie ride |
Often |
Rider size, guarding, supervision |
|
Dark ride |
Partly |
Vehicles, controls, evacuation, building interfaces |
A park containing several attraction types may need different ASTM standards, plus local building, electrical, fire, and accessibility requirements.
Larva Blooms-Family Amusement Rides
10 Documents Buyers Should Always Request
ASTM compliance cannot be verified through a supplier’s statement alone. Buyers need model-specific documents showing how the ride was designed, manufactured, tested, installed, and prepared for safe operation.
| Document | Purpose | Buyer Check |
|---|---|---|
| Structural Calculations | Verify the ride's structural strength and safety. | Confirm the calculations match the purchased ride model. |
| Material Certificates | Verify material quality and traceability. | Check material grade and supplier information. |
| Welding & NDT Reports | Confirm weld quality and inspection results. | Ensure critical welds have been inspected. |
| Factory Acceptance Test (FAT) | Verify the ride was tested before shipment. | Review functional and safety test records. |
| Electrical Drawings | Support installation and maintenance. | Confirm wiring and safety circuit information is included. |
| Foundation Drawings | Guide foundation construction and installation. | Check foundation dimensions and anchor locations. |
| Operation Manual | Provide safe operating procedures. | Verify operating limits and emergency procedures. |
| Maintenance Manual | Define routine inspection and servicing. | Review maintenance intervals and inspection requirements. |
| Spare Parts List | Support long-term maintenance. | Confirm critical spare parts are included. |
| Inspection & Commissioning Report | Verify final installation and commissioning. | Ensure the report is signed and complete. |
These documents should be delivered and reviewed before final acceptance, with each file tied to the purchased ride model, serial number, and configuration. Generic manuals, incomplete test reports, or calculations prepared for another ride should be treated as warning signs.
In practice, manufacturers such as SUNHONG support technical review with model-specific equipment parameters, steel quality records, installation requirements, sensor and limit-switch details, and fault-code troubleshooting guidance, giving buyers clearer evidence for ASTM compliance and future maintenance.
14P Marvelous Circus Merry Go Round for Sale
ASTM vs. EN 13814 vs. CE vs. ISO 9001
| Standard / System | What It Covers | Best For |
|---|---|---|
| ASTM F24 | Safety standards for amusement ride design, manufacturing, operation, maintenance, and inspection. | Projects in North America or those specifying ASTM requirements. |
| EN 13814 | European safety standard for amusement rides throughout their lifecycle. | Projects in Europe or those following EU ride standards. |
| CE Marking | Demonstrates compliance with applicable EU product legislation. | Products sold or placed on the EU market. |
| ISO 9001 | Quality management system for manufacturers. | Evaluating a manufacturer's quality management processes. |
ASTM F24 and EN 13814 address amusement ride safety directly, while CE marking and ISO 9001 serve different compliance and quality-management purposes. They should not be treated as interchangeable.
Buyers should confirm which requirements apply to the destination market and request ride-specific calculations, test reports, manuals, and inspection records. Several certification logos alone do not prove that a particular ride meets the required safety standard.
Common Mistakes Buyers Make
Often, buyers make mistakes. Buyers often make mistakes.
Earning ASTM F24 as a Single Certificate
An ASTM certificate isn't a guarantee of the design, manufacture, and testing of any particular ride to the applicable standards.
Securing Just Compliance with Only CE or ISO 9001
While CE marking and ISO 9001 are different positions and cannot be a substitute for ride-specific calculations, testing, manuals, or inspection records.
Ignoring Technical Documents
ASTM can be backed up with engineering calculations, drawings, material records, test reports, and operating documents.
Skipping Factory Inspection
It is generally easier and cheaper to fix defects prior to shipment than after installation.
Choosing Only by Price
A low quote might not include engineering review, commissioning, training, spare parts, inspection, or full documentation, adding to the expenses in the long run.
How to Check ASTM Compliance
- Engineering Calculations: Check structural loads, passenger capacity, speed, wind, and fatigue analysis.
- Material Certificates: Verify the grade of steel, specification of components, and material traceability.
- Factory Acceptance Test (FAT): Check test results for operating faults, emergency stops, interlocks, sensors, restraints, and brakes.
- Inspection Records: Ensure that manufacturing, installation, and commissioning checks have been carried out.
- Operation and Maintenance Manuals: Check rider limits, daily checks, maintenance periods, wear periods, and emergency procedures.
- Technical Drawings: Check structural, electrical, foundation, and installation drawings from the item purchased.
- Spare Parts List: Determine critical parts, recommended quantities, part numbers, and lead time.
All records must be the same ride model, configuration, and serial number before final acceptance.
SUNHONG's Support for ASTM-Compliant Amusement Rides
SUNHONG provides amusement ride solutions designed to support ASTM F24 requirements, with engineering documents, factory testing, free installation support, and operation guidance.
Our services include:
✔ Model-specific technical documents, drawings, and manuals
✔ Factory testing and quality inspection before shipment
✔ Global installation and commissioning support
✔ Compliance support for ASTM F24, EN 13814, CE, and ISO 9001 requirements
✔ Complete solutions from ride design to park operation
With 25+ years of manufacturing experience, a 30,000㎡ factory, and 1,000+ global projects, SUNHONG helps buyers build safer and more reliable amusement park projects.
Contact us today to request technical documentation, project support, and a customized quotation.
FAQ
1. What is ASTM F24?
ASTM F24 is the ASTM International technical committee that is responsible for the development of amusement ride and amusement device standards. It includes standards for various ride categories and equipment life cycle phases.
2. Is ASTM a certificate?
ASTM does not issue one certificate for all amusement rides. The buyer should ask to see proof of the ASTM standards used on the ride they have chosen.
3. Is ASTM mandatory?
This would depend on where the project is taking place. Local regulations, approval authorities, insurance requirements, purchase contracts, and project specifications may require compliance with ASTM standards.
4. The American Society for Testing and Materials (ASTM) sets standards.
Committees develop ASTM standards and can involve manufacturers, engineers, operators, inspectors, government representatives, or other industry experts. This consensus-building approach allows for a range of technical and operating viewpoints to be included.
5. What rides are covered by ASTM?
Many types of amusement rides, including roller coasters, Ferris wheels, flat rides, kiddie rides, bumper cars, water rides, inflatables, go-karts, and adventure rides, are covered by ASTM F24 standards. However, riders interested in purchasing should verify the applicable standard for the ride type chosen.
6. Can ASTM be substituted for CE?
The ASTM standards and CE marking are not the same. In addition to ASTM, a project going into the EU market may need to take into account the applicable EU legislation, EN 13814, national requirements, and local inspection procedures.
7. What are the documents that demonstrate adherence to ASTM?
This can be done using relevant evidence, such as engineering calculations, material certificates, a welding record, factory test reports, electrical drawings, foundation drawings, operating manuals, maintenance instructions, inspection reports, etc. These documents should be the same model and configuration that was purchased.
8. How many checks should be conducted on rides?
The frequency of inspections varies according to the type of ride, the number of hours the ride is used, manufacturer recommendations, local laws, environmental conditions, and results of previous inspections. The majority of parks integrate daily inspections and scheduled maintenance with regular professional inspections.
9. Will the Chinese manufacturers become capable of meeting ASTM standards?
Yes. Compliance is not a function of the manufacturer's country but rather of the engineer's capability, manufacturing control, test quality, documentation, and/or inspection quality. Purchase riders should take a look at the technical proof for that particular ride, rather than just believing the company's claims.
10. What is the difference between ASTM F24 and EN 13814?
They both cover amusement ride safety but are part of different standards systems. ASTM F24 is utilised in North America and global projects, and EN 13814 is regularly specified for use in projects in Europe. The requirements will be applicable based on the destination market and approval authority.
How to Build a Profitable Amusement Park in India's Extreme Heat: 4 Sustainable Solutions & Investment Costs
Amusement Rides for Kazakhstan: Investment Guide & Equipment Solutions
How to Build an Indoor Playground: Cost, Equipment, Location & ROI Guide
The Ultimate Funfair Amusement Rides FAQ & Buying Guide (2026)
How Does a Carousel Work? The Complete Guide to Carousel Mechanics
Commercial Carousel Rides for Sale | Factory Direct Manufacturer
Larva Reindeer Sleigh - Christmas Theme Amusement Ride for sale
Larva Flying Chair Swing Ride – Thrilling Amusement Park Ride with Larva IP Theme
Larva Tagada Disco Ride – Thrilling Disco Amusement Park Ride with 2 Switchable Modes
Leave a message
Ready to elevate your amusement offerings?
Contact Sunhong today to explore how we can bring your vision to life and create unforgettable experiences for your visitors.
* Rest assured that your privacy is important to us, and all information provided will be handled with the utmost confidentiality.
Copyright © 2025 SUNHONG All Reserved.




Whatsapp: +8613922331804
Guangzhou Shunhong Entertainment Equipment Co.,Ltd.
sunhongrides
SUNHONGAMUSEMENTRIDES
Scan QR Code